Monday, November 18, 2013

A Little Story



I originally planned to tell you a little tale of my recent finishing kick amongst projects in my knitting basket, but another little story happened that has to come first- a distraction, if you will.


Early Saturday morning I woke up to my husband telling me I needed to get up and get ready to go. Now, we had no plans for this particular Saturday, which doesn't happen often around here, so I was very confused. Plus it was very early. Way too early to get up on a Saturday with no plans. He went on to tell me how he had arranged for me to go to a spinning class and spend a bit on fiber, but I needed to get moving because it's about an hour drive to the nearest shop that teaches spinning. I was still a little confused, but happy and I got in the shower while he told me exactly what was going on. He had a list ready of what I needed to bring to class, had already packed what he knew to pack, and had even put the shop address into the GPS for me.


So I got in the car and drove and spent the entire time excited to get some more time spinning on the Lendrum in a class since I won't be able to buy a wheel for awhile. I thought through fiber and what I have in my minuscule stash at home so that I could look at some different fibers this time.


I signed in for class and got a little bit more information about exactly what the class was. It was a sampling class, a "step 2" for new spinners. They assumed you'd spun for a little while and needed a few basic questions answered, but then we would be given time to try out a few different fibers and also to work on short draw, long draw, and spinning from the fold.


I told the instructor that I've been spinning on a drop spindle for the last 9 months and that the class was a surprise and I wasn't sure I would be able to attempt different techniques during class since I haven't spun on a wheel since last February. She was very kind and smiled and said, "I'm sure you're hands will only take a few minutes to adjust to the wheel versus the drop spindle." I told her I wanted to be sure to sit at a Lendrum since it's the wheel I'm planning to buy in the future, and she assured me that could be arranged.


And then we went to the classroom, where a Lendrum sat in front of the first chair, with a red ribbon and a name tag made out to me.


My husband is known for sneaky fiber-related gifts, and he did it again- I was so very surprised. We had talked quite recently about being able to get the wheel in May or June, just in time for my birthday and another round of Tour de Fleece, so I was not at all expecting a wheel for Christmas... especially in November.






Her name is Lola, to join a long line of geeky references- it's just the way we name things around here. I spun on her in class all morning Saturday, and my boys were all gracious enough to allow me to spin on her during family movie night on Saturday. I spun a little more yesterday afternoon during Ellie's nap, and my... she is so wonderful. The singles I've spun so far are not super consistent, but better than I thought they would be. I'm sticking with short draw at the moment, but I'm going to make sure to practice some long draw in the near future.




Wednesday, November 13, 2013

FO: Ellie's Stripey Cardigan











Pattern: my own improvisation




Yarn: BerrocoVintage Worsted




Needles: US Size 7




For: my 18 month old daughter








Cast On to Cast Off: I don't really wanna say since it makes it sound like such a LONG project- it has about 20 hours in it because of the re-thinking and ripping back as I improvised. I started it in June and finished it this past weekend.


Notes: I did a few decreases just past the elbow since Ellie doesn't like wider swinging sleeves and I really like how they turned out. I settled on seed stitch for the button band, sleeve cuffs and bottom edge after going through various ribbings. You can look at my Ravelry notes for details on some of the things I did.






Things I Learned: Even though this project took awhile time wise, I'm really glad I jumped in and tried going without a pattern. Yes, a pattern makes it so much easier since the decisions are all made for you with a known outcome and (most importantly) the math is all there! But, I learned a lot in the process and it helped connect some concepts about construction in my head.



Overall: A good project made even better by the fact that Ellie really likes to wear this cardigan. Now if only I could get a picture of her wearing it that isn't a blur of motion.


Wednesday, November 6, 2013

Together






I'm so loving seeing the kids together these days. While the boys were reading their current chapter books on the couch last Friday Ellie climbed up with them to "read" a Star Wars chapter book upside down and I had the three of them in a row on the couch in the family room all looking deep in thought while thinking about very different things.


Ellie runs after them to "tickle" and they all giggle and the boys indulge her even though her tickles often include unintentional pinching and scratching.


The boys regularly load Ellie into a laundry basket and stuff blankets and pillows around her before taking her for rides- sliding the basket along the carpet in short bursts. She laughs and they laugh and they add stuffed animals to the basket.






For as much growing up as Ellie has done in the last 18 months, it is Ender who has changed the most. He didn't want a sister- in fact he wasn't a fan of adding another child to our family. He likes status quo and adding another kid threw his world for a loop- but for the better. He's learning to take care of someone who cannot take care of herself, he now understands that her cry means she needs a response of some sort, and I think he enjoys the detective work sometimes involved in discerning what a non-talking toddler needs. He thinks she is incredibly funny (she is) and he has learned that including her in the "big kid" games can make for a hilarious time.


I'm so thankful for the time they have growing up together.

Monday, November 4, 2013

FO: Little Mitts





{Ravelry notes}


I love thumbless mittens for toddlers, but these little mittens have a funny way of deceiving me- I know I can knit them up quickly because they are small and don't have that thumb to mess with, but that somehow translates into me only putting on a few stitches here and there because it's "not a big project". But now that it's cold the mittens need to be done, so this weekend I made sure that happened.


Ellie likes them, but hasn't learned to keep them on quite yet. When I first put them on her she wiggled her fingers as if the mitten was a puppet and then took them off and said "toes?" and tried to put a mitten on her foot like a sock. The boys got a good laugh out of that one. 


I'm planning to knit her another pair or two in worsted weight since my boys frequently lost mittens at this age- I don't want to be caught without backups now that winter is well on its way.

Friday, November 1, 2013

Hello, November




It's autumn for real now, and I've had no problem packing up the sewing machine and moving happily back to knitting during all of my creative time. I finished one little mitt last night after the holiday festivities were over and kids in bed for the night.- only 3 more to go until the kids are fully mittened for this year. Then on to hat finishing, then sweater finishing...


It's safe to say that the finishing mood I rely on 3 or 4 times a year has arrived to save me from my piles of unfinished projects. I have Christmas gifts to knit, with only one of them begun but I can't in good conscience (and lack of spare needles) cast on anything else until I get some things OFF the needles.


Current In Progress:

Ellie's mittens (1 of 2 complete)
Ellie's striped cardi (a tiny bit of sleeve and the button band to go- so close!)
The Shapely Boyfriend sweater (down to just a little more sleeve and the button band!)
Exploding Socks
A hat for Halos of Hope


Must get moving on:

Ezra's mittens
Ezra's Winter Hat
Ender's Winter Hat
Ellie's Winter Hat
Ender's Christmas Sweater
Ezra's Christmas Sweater
Ellie's Christmas Knit (still deciding on a pattern.


I need to work a bit out of order- I can't just knit through the current "in progress" things because all the mittens must be done first (because COLD) and then I need to finish Ellie's cardi and then the hats and then at least get cast on for the boys' sweaters within the next two weeks if I'm going to have a real chance at finishing them before Christmas. There are cables you see, and I'm not the fastest at that particular technique quite yet since I don't cable often.



No longer in progress is the Cerus scarf- I pulled out the 5 rows I had knit (about 1500 stitches *sob*), but it was worth it because I started it without thinking about the fact that it would roll without a little garter or ribbing or something and that would make me unhappy later I think. Plus by taking that off the needles its on I now have free the cable I need to be able to do the button band on my Shapely Boyfriend Cardi. That took the sting our of the rip back. Now I can finally get that button band going.


I think the real solution here is that I need an additional set of cables and perhaps even another set of interchangeables... but not for awhile. Not until after I manage to save up for and acquire a spinning wheel. :)



Related Posts Plugin for WordPress, Blogger...